Abeytunga, P K (1978) The role of the first line supervisor in construction safety: the potential for training, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Allenby, V R (1986) Cost models for engineering services, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE, Unpublished PhD Thesis, , Aston University.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes, Unpublished PhD Thesis, , Aston University.

  • Type: Thesis
  • Keywords: duration; measurement; drainage; pipeline; construction method; estimating; excavation; work study; simulation
  • ISBN/ISSN:
  • URL: https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.238018
  • Abstract:
    In 1974 Dr D M Bramwell published his research work at the University of Aston a part of which was the establishment of an elemental work study data base covering drainage construction. The Transport and Road Research Laboratory decided to, extend that work as part of their continuing research programme into the design and construction of buried pipelines by placing a research contract with Bryant Construction. This research may be considered under two broad categories. In the first, site studies were undertaken to validate and extend the data base. The studies showed good agreement with the existing data with the exception of the excavation trench shoring and pipelaying data which was amended to incorporate new construction plant and methods. An inter-active on-line computer system for drainage estimating was developed. This system stores the elemental data, synthesizes the standard time of each drainage operation and is used to determine the required resources and construction method of the total drainage activity. The remainder of the research was into the general topic of construction efficiency. An on-line command driven computer system was produced. This system uses a stochastic simulation technique, based on distributions of site efficiency measurements to evaluate the effects of varying performance levels. The analysis of this performance data quantities the variability inherent in construction and demonstrates how some of this variability can be reconciled by considering the characteristics of a contract. A long term trend of decreasing efficiency with contract duration was also identified. The results obtained from the simulation suite were compared to site records collected from current contracts. This showed that this approach will give comparable answers, but these are greatly affected by the site performance parameters.

Berny, J (1988) Forecasting and risk analysis applied to management planning and control, Unpublished PhD Thesis, Aston Business School, Aston University.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process, Unpublished PhD Thesis, , Aston University.

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries, Unpublished PhD Thesis, , Aston University.

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

El Bakry, S M (1981) Measurement of productivity and cost of the direct labour organisation within highways maintenance departments, Unpublished PhD Thesis, , Aston University.

Flanagan, R (1980) Tender price and time prediction for construction work, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Haghdadi, H (1989) The role of micro computers on the construction site, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering, Unpublished PhD Thesis, , Aston University.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry, Unpublished PhD Thesis, Aston Business School, Aston University.

Johnston, J O D (1975) Development of a computerised library system in the construction industry, Unpublished PhD Thesis, , Aston University.

Jones, A M (1990) Design and construction for traditional house building, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Kim, K (2015) Conceptual building information modelling framework for whole-house refurbishment based on LCC and LCA, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Kotula, M (2013) Development of a risk-oriented strategic sourcing framework for the construction and electronics manufacturing industries, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods, Unpublished PhD Thesis, , Aston University.

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Parker, M A (2022) Developing a performance index to measure soft skills on construction projects: a Delphi study, Unpublished PhD Thesis, , Aston University.

Peckitt, S J (2001) Construction industry safety culture: a comparative study of Britain and the Caribbean, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Prabhu, S P (1980) Effective tendering for large scale overseas turnkey projects, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting, Unpublished PhD Thesis, , Aston University.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems, Unpublished PhD Thesis, , Aston University (United Kingdom).